The newest M109 version for U.S. service is the M109A7, formerly known as the M109A6 Paladin Integrated Management (PIM). The M109A7 shares common components with the Bradley Fighting Vehicle such as the engine, transmission, and tracks. This creates commonality with other systems and maximizes costs-savings in production, parts inventory, and maintenance personnel. The M109A7's on-board power systems harness technologies originally developed for the Non-Line-of-Sight Cannon; the electric drive is faster than the previous hydraulic system, and the automatic rammer more consistently rams the round into the gun for consistent velocities and better accuracy. It features a 600-volt on-board power system to accommodate additional armor and future networking technologies as they become ready. The M109A7 can sustain a one round per-minute rate of fire and a maximum rate of fire of four rounds per-minute. Weighing 78,000 lb (35,000 kg), the M109A7 is 10,000 lb (4,500 kg) heavier than its predecessor, and it has the capacity grow to 110,000 lb (50,000 kg). Even with the weight increase, the M109A7 can travel faster than previous versions at 38 mph (61 km/h) and is more maneuverable than a Bradley Fighting Vehicle.
Prototypes of the vehicle underwent government testing in preparation for a low-rate initial production decision. The testing included reliability, availability, and maintainability mission testing as well as ballistic hull and turret testing. M109A7 was slated to begin low-rate initial production by 2013. The U.S. Army plans on procuring a fleet of 580 sets of M109A7 howitzers and M992A3 ammunition support vehicles.
In October 2013, the Defense Acquisition Board approved the decision to start M109A7 production. The FY 2014 budget called for $340.8 million in Paladin funding, which would be two dozen vehicle sets at $14.4 million per vehicle. The Army plans to buy 133 vehicles in 66 one-half vehicle sets starting in 2014, although one M109A7 howitzer and two supporting M992A3 ammunition carriers will be destroyed during tests. A full-rate production decision planned for February 2017. On 31 October 2013, BAE received a $668 million contract to begin low-rate initial production of the M109A7. The first M109A6 and M992A2 vehicles were disassembled and reassembled to M109A7 and M992A3 standard as part of low-rate initial production beginning in summer 2014. Low-rate production deliveries began in April 2015.
- Prototype. The M109 Paladin Integrated Management, or "M109 PIM," is slated to begin low-rate initial production by 2013. The 40-ton, next-generation 155mm Howitzer artillery cannon is able to fire precision rounds, accommodate additional armor protections and power more on-board electrical systems.
|